Remeha condensing boilers at Mercure London Heathrow Hotel

Mercure Hotel

Remeha high efficiency condensing boilers have been installed at the four-star Mercure London Heathrow Hotel to meet the requirement for reliable high-performance space heating and hot water provision.


When the existing boilers began to fail at this premier hotel, the management was quick to act to maintain the very highest comfort levels for its guests.


Heating and hot water are typically large users of energy in hotels, so energy efficiency was a key requirement to keep costs and environmental impact low. In terms of boiler selection, a further consideration for project contractors Pipetech Mechanical was boiler size due to the restricted available space within the small, low-ceilinged plant room.


Project contractors Pipetech Mechanical recommended installing two Remeha Gas 220 Ace high efficiency floor standing condensing boilers as the best solution for this project.


Fred Byng, MD at Pipetech Mechanical, said: “We recommended Remeha because we have worked with them on previous projects and have found their boilers to be extremely reliable and efficient. This is backed by the excellent service we receive from our Sales Manager.”


The design of the Gas 220 Ace made it perfectly suited to the Mercure London Heathrow Hotel, as Fred explained:


“The narrow, slim dimensions of the Gas 220 Ace boilers were a major benefit on this project,” said Fred. “The design of the boilers enabled a smooth installation and allowed us to install a high heat output in a compact footprint.”


An added challenge on the project was the need to avoid any interruption to the heating service throughout the works.


To achieve this, Pipetech Mechanical removed two of the old boilers to make space for the first of the new Remeha boilers. Once this was fitted and running, the system could be switched over. The last of the old boilers was then removed and the second new Remeha boiler installed. A plate heat exchanger was applied to separate the heating and boiler circuits and protect the new boilers from any debris or contaminated water.


“The project went extremely well with the hotel experiencing no downtime whatsoever,” added Fred. “The new Remeha boilers are operating really reliably and completely trouble free. And as they are successfully meeting the requirements for high comfort levels and efficiency at the hotel, our client is delighted.”


The Gas 220 Ace is a premium boiler that exceeds expectations in both performance capability and design simplicity, making it the perfect solution at the stylish Mercure London Heathrow Hotel.

Gas 220 Ace

The Gas 220 Ace is a premium floor standing boiler that exceeds expectations in performance capability and design simplicity.

Related Articles

Dartford Civic Centre Case Study - Remeha Commercial Projects

Public Sector

Dartford Civic Centre

Dartford Borough Council installs Remeha boilers at Civic Centre to improve heating reliability and efficiency.
Nottingham City Hospital Case Study - Remeha Commercial Projects

Public Sector

Nottingham City Hospital

Remeha boilers selected for their proven reliability and quality at Nottingham City Hospital’s Children’s Centre.
Marriot International Case Study - Remeha Commercial Projects

Commercial

Marriott International

Exciting BREEAM ‘Very Good’-rated double-decker hotel in the heart of Slough.
blackberry Hill Case Study - Remeha Commercial Projects

Commercial

Blackberry Hill Vistry Partnerships

Vistry Energy installs a premium offsite-fabricated packaged plant solution.

About Remeha

Our dedicated experts and comprehensive project approach support you from concept to commission to achieve your project goals.